Geogrid construction process

Geogrid construction process

2019-01-07


Geogrid construction process: inspection and cleaning of the lower bearing layer → artificial laying of geogrid → lap joint, lashing, fixing → paving the upper roadbed soil → rolling → detection. The geogrid is laid on the flat lower bearing layer according to the width required by the design. The upper and lower layers of the packing do not smash the debris of the geogrid. When the geogrid is laid, the direction of high strength is arranged perpendicular to the axis direction of the embankment. The geogrid is laid horizontally. Tightening and pulling when laying, avoiding wrinkles, twists or potholes. The geogrid is spliced along the longitudinal direction by a lap joint method, and the lap width is not less than 30 cm. After the geogrid is laid, the upper layer of filler is artificially laid, and the rolling is completed in time to avoid long-term exposure. Then use mechanical transportation, leveling, and rolling. The mechanical paving and rolling are pushed from the two sides to the middle, and the rolling is carried out from the two sides to the middle, and the compaction degree is maintained to meet the specification requirements.

Related Products

Related Industry Information
Copyright © 2020 Feicheng Lianyi Engineering Plastics Co., Ltd All rights reserved.
Communicate with Supplier?Supplier
Allen Mr. Allen
What can I do for you?