Home> Industry Information> Geogrid construction process

Geogrid construction process

January 02, 2019

IMG_1824IMG_1825
Geogrid construction process: testing, clearing the lower bearing layer → artificial laying geogrid → lap, banding, fixing → paving the upper subgrade soil → roller compaction → testing. The geogrid is laid on the flat lower bearing layer according to the width of the design requirements. The fillers on the upper and lower layers do not have any damage to the geogrid. When laying the geogrid, the direction of high strength is perpendicular to the direction of the embankment axis. Geogrid laid horizontally. Tighten and stretch when laying to avoid wrinkles, twists, or pits. The geogrid is lapped in the longitudinal direction and the lap width is not less than 30cm. After paving the geogrid, the upper layer filler is artificially laid to complete the rolling in time to avoid long-term exposure. Then use mechanical transport, leveling, and roller compaction. The mechanical paving and rolling are carried out from both sides to the middle. The rolling is performed from both sides to the middle, and the degree of compaction is maintained to the specification.

The above is the Geogrid construction process we have listed for you. You can submit the following form to obtain more industry information we provide for you.

You can visit our website or contact us, and we will provide the latest consultation and solutions

Share to:

Send Inquiry

Home> Industry Information> Geogrid construction process

Copyright © 2024 Feicheng Lianyi Engineering Plastics Co., Ltd All rights reserved. Privacy Policy

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send